E1

e2

e3
 

 

                                                   Application
This procedure is used to determine the resistance to coating adhesion loss of coated surfaces of aluminum,plastic, steel, and other substrates when subjected to a wet blast similar to that produced by vehicle wash equipment.

 

 

                           Apparatus and Materials Required
Film Thickness Gauge
      per Ford Laboratory Test Method BI 117-01
Carbide Tip Scribe
      CTS (General Scribe #CM 88) - or equivalent
     12015 egraph Rd.
     Detroit, Michigan U.S.A.
     (313) 531-7668
Utility Knife
      Stanley, Quick Point 10-300 - or equivalent
     (break away tips)
Water Immersion Tank
     Per Ford Laboratory Test Method BI 104-01
    Note:  Thermal shock testing requires:
        a.  38 +/- 2 °C water temperature
        b.  5 ppm maximum dissolved solids
Heater/Circulator
       Fisher Scientific 13-874-70J - or equivalent
Dissolved Solids Meter
      Myron L Company - or equivalent
      833 East Broadway
      San Gabriel, California
Freezer
      Capable of minus 29 +/- 2 °C temperature 

Steam Generator
   a.  Input flow of water to be 2.7 +/- .1 L/min (*).
   b.  Nozzle diameter to be 12.5 +/- .3 mm ID and at least 100 mm long.
   c.  Discharge dynamic head to be 37.9 +/- 1.9 kPa measured 25 mm from the nozzle  using 
??       a   4.7 mm ID tube. A substantially non-diverging discharge is required for this test (**) 
??    (***) (see Figures 1 and 2).
Note:  Electro-Magic Model 100 (and the earlier Model 60) Steam Generator available only 
      from:Atomic Cleaning Systems, 31651 West Eight Mile Road, Livonia, MI 48150, Phone: 
??       (248) 615-4400, has been found to be satisfactory. The Model 100 or Model 60 are no 
??       longermanufactured directly by Electro-Magic. However, Atomic Cleaning Systems is
??       capable ofmodifying new Electro-Magic models to meet the Model 100 specifications
       required for this test.Milwaukee 1/2 inch globe valve No. 1151-1161, 150 SWP 300 WOg
??      is adequate for use in  standardization of generator.
Model 100 Steam Generator
(*)    The pumping pressure is directly related to the input flow rate. The pressure needed for
        therequired flow can be determined by measuring the pump pressure and discharge
        flow rate withthe burner off. When the burner is turned on, the required flow rate is
??        obtained by readjusting to the required pump pressure.
(**)    This is done by placing the tube midstream 25 mm from the nozzle. The tube size must  
??         not bevaried because the densities and velocities are not uniform throughout the cross
??        section of thedischarge stream.
(***)  Adjusting the discharge dynamic head may be required. This must be done in such a
      way thatthe input flow rate as specified in Para (a) above is maintained. This is done by
     adjusting the amount of heat transferred to the water. Increasing the heat will cause the
     flow rate (pressure) of (a) to change. It must be readjusted. This operation will result in an
??      increased dynamic pressure; to decrease it, decrease the heat and then adjust the flow
??    (pressure).

Thermometer
??       Capable of measuring 100 +/- 2 °C
Face Mask
      Full face cover safety mask is required when performing this test.
Gloves
     Gauntlet-type gloves for protection of hands are required.


                                    Conditioning and Test Conditions
  All test values indicated herein are based on material conditioned in a controlled atmosphere of 23 +/- 2 ??C and 50 +/- 5 % relative humidity for not less than 24 h prior to testing and tested under the same conditions unless otherwise specified.

                                                          Procedure
1.  Standardize the Model 60 or Model 100 Steam Generator.
    a.  Measure and maintain the input flow at 2.7 L/min. Install a 12.5 mm globe valve in the
??        steam line between coil weld assembly and a 5/32 inch hose nipple. With burner off,
??         engage pump and adjust globe valve until 2.7 L/min is obtained.
        Record the tank pressure that is obtained with the 2.7 L/min flow rate. (This induced
         back pressure simulates the pressure that steam exerts on the system while the burner
         is on.)
   b.  Measure and maintain the mean dynamic head at 37.9 kPa (5.5 psi) using the fixtures as
       described in Figures 1 and 2. Open globe valve and turn on the burner. Allow tank
??       pressure   tostabilize before reading the mean dynamic head. Adjustments of the
       dynamic head are to be  made by changing the amount of heat transferred to the water
??       at the burner. (The flow  rate, as  specified above, must be maintained.)
    c.  Measure and maintain a 98 +/- 2 °C temperature of the steam blast at the test
??        sitedistance.

2.    Measure film thickness per Ford Laboratory Test Method BI 117-01 at proposed test sites
     and record.
3.  Immerse the parts or panels (previously prepared per Engineering Materials Specification)
??     in the water immersion tank for four hours at 38 +/- 2 °C. Aerate the water by placing 6.5
??     mm ID plastic tube at the bottom of the tank and bubble air at a rate of one bubble per
??     second minimum. Maintain a 5 ppm maximum dissolved solids (as NaCl) in the water.
??     Check and record NaCl level using a dissolved solids meter.
4.  Remove the samples after four hours of water immersion and cut an "X" through the
??      coating into the substrate across the panel or part where feasible (see Figure 3).
      a.  Use a scribe to make the cut if the substrate is metal or hard, rigid plastic.
      b.  Use a utility knife to make the cut if substrate is an elastomeric material.
5.  Place the test samples in a freezer at minus 29 +/- 2 °C for a three hour minimum freeze
    cycle.
6.  Within 30 seconds from freezer removal, direct the steam blast at the center of the "X" cut,
??    at a distance  of 2 to 3 inches and 45° to the sample, in the direction shown in Figure 3.

 Note:  High pressure wet steam represents a potential safety hazard. Not only is it necessary|
            to secure the samples properly, but full face protection and gloves are required.
7.  After 30 seconds, record area (mm2) of coating removal by visually measuring with a
??      metric ruler  (typical triangular coating removal: Area = 1/2 Base x Height). Also examine
??      the surface and report  any blushing, whitening, or loss of gloss.
8. If a failure occurs, note number of seconds after steam black initiated that the failure 
      occurred.


Chemicals, materials, parts, and equipment referenced in this document must be used and handled properly.
Each party is responsible for determining proper use and handling in its facilities.
                                                     ATTACHMENT ONE
                                                      RATING SCALE FOR
                                             THERMAL SHOCK TEST PANELS

                                                    RATING               PEEL BACK
                                                            20      =       No removal
                                                            19      =       < 0.5 cm^2
                                                            18      =       < 1.0 cm^2
                                                            17      =       < 1.5 cm^2
                                                            16      =       < 2.0 cm^2
                                                            15      =       < 2.5 cm^2
                                                            14      =       < 3.0 cm^2
                                                            13      =        < 3.5 cm^2
                                                            12      =        < 4.0 cm^2
                                                            11      =        < 4.5 cm^2
                                                            10      =        < 5.0 cm^2
                                                             9       =         < 5.5 cm^2
                                                             8       =         < 6.0 cm^2
                                                             7       =         < 6.5 cm^2
                                                             6       =         < 7.0 cm^2
                                                             5       =         < 7.5 cm^2
                                                             4       =         < 8.0 cm^2
                                                             3       =         < 8.5 cm^2
                                                             2       =         < 9.0 cm^2
                                                             1       =         < 9.5 cm^2
                                                             0       =          > 9.5 cm^2
                                  SEE SPECIFICATION FOR ACCEPTANCE CRITERIA RATING

 

undefined

                                                        Figure 1

undefined
 

                                                         Figure 2

 undefined

                                                                 Figure 3

undefined

                                                    Figure 4

會(huì)員登錄

×

請(qǐng)輸入賬號(hào)

請(qǐng)輸入密碼

=

請(qǐng)輸驗(yàn)證碼

收藏該商鋪

X
該信息已收藏!
標(biāo)簽:
保存成功

(空格分隔,最多3個(gè),單個(gè)標(biāo)簽最多10個(gè)字符)

常用:

提示

X
您的留言已提交成功!我們將在第一時(shí)間回復(fù)您~
撥打電話
在線留言
主站蜘蛛池模板: 欧美 日韩 亚洲 成人| 亚洲韩国偷拍在线观看| 韩国理论电影漂亮的保姆| 亚洲欧美中文字幕天美| 欧美精品人妻在线视频| 自拍区偷拍亚图片小说| 亚洲国产乱| 国产精品一区二区麻豆| 毛片av永久在线观看| 欧美精品久久久久久精华液| 国产极品粉嫩福利姬萌白酱| 精品国产麻豆一区| 国产在线观看免费视频| 亚洲日本无码一区二区三区四区卡| 日韩国产欧美精品一区二区| 国产揄拍国产精品| 狼人大香伊蕉国产WWW亚洲| 久久免费看少妇高潮A片手机版| 精品人妻无码一区二区三区婷婷| 亚洲性夜色噜噜噜在线观看不卡| 欧美,日韩,亚洲| 欧美一区二区三区粗大爽| 精品日韩久久久久久| 妺妺洗澡时忍不住c了她| 中文字幕高清免费日韩视频在线| 年轻的妈妈2韩国| 日韩午夜一级片| 中文字幕剧情人妻| 粗大分开挺进内射| 娇妻被交换粗又大又硬视频| 午夜福利1000集看看| 日韩在线一区免费| 少妇肉欲小说200篇| 精品亚洲麻豆1区2区3区| 欧美一级大片在线播放| 欧洲成人午夜精品无码区久久| 嗯啊HH禁忌翁公| av男人天堂首页网址| 欧美一区二区三区在线bbb| 色噜噜一区二区三区| 国产女人乱人伦精品一区二区|